Deck, retaining wall and landscaping

Submitted by colin on Mon, 12/03/2012 - 15:50

This job involved removing 120 cubic metres of soil from around house, then a drilling rig was brought in to drill 600mm diamter holes 4 meters deep. A specialised hiab truck was then used to lift 8 meter long poles the holes. Then a concrete pump was used to pump 3 cubic metres of concrete in the holes. Once this was completed, work then began on building the Kwila deck and landscaping the rest of the property. Below are some before, during and after shots of this job.